Playhouse Guised as a Water Tower

Inspired by this old drawing I found.
SCROLL DOWN
image
image
We started with a section of an 8'-diameter culvert.
image
My son "the Pace" helped.
image
The ceiling.
image
We used 2"x10" LVL to create a level plane.
image
A little math.
image
The Pace.
image
Framing done with LVL.
image
Roof framing completed.
image
Pace, king of all power tools.
image
We insulated the attic of the water tower.
image
Not sure what he's up to, but I'm following his lead.
image
Roof sheathing completed.
image
Ready for plank siding which is purely decorative.
image
First wood plank installed.
image
Do you know why steel straps are closer together near bottom?
image
Metal roof fabricated and installed.
image
Time out, Dad.
image
Footing excavation.
image
Used up all the scrap rebar we could find.
image
15 cubic yards of concrete.
image
Thanks goodness for telehandlers.
image
Spiral stairs will get painted and treads will be installed in the Spring.
image
Second floor will be a net from which kids can see out viewing slots.
image
Final painting will be done when it warms up.
image
All done.
image
Nick's Photo Galleries
image
Write Nick
Nick Gromicko 1750 30th Street Suite 301 Boulder, CO 80301
Contact Nick
(720) 272-8578
gromicko@msn.com
Follow Nick
Copyright © 2022-2024 Nick Gromicko. All rights reserved.

We use cookies to enable essential functionality on our website, and analyze website traffic. By clicking Accept you consent to our use of cookies. Cookies and Privacy Policy.

Your Cookie Settings

We use cookies to enable essential functionality on our website and analyze website traffic. For more information, read our Cookies and Privacy Policy below.

Cookie Categories
Essential

These cookies are strictly necessary to provide you with services available through our websites.

Analytics

These cookies collect information that is used in aggregate and in an anonymized form to help us understand how our website is being used and how effectively our site is performing.